VIMARI
DEVELOPMENTS GROUP INC
Get a Quote
Case Studies

The story behind the spaces

Real projects, real budgets, real outcomes — drag the slider to see the before and after.

Whole-Home Renovation · Leslieville

A dated semi, reborn for a growing family

Before — original interior
After — renovated interior
After
Before
‹ ›
Scope
Full interior
Size
2,200 sq ft
Budget
$385,000
Timeline
7 months
The Goal

A young family had outgrown their century semi. They wanted an open main floor, a true primary suite, and a finished lower level — without losing the home's original character.

The Solution

We reconfigured the main floor around a new kitchen and steel beam, added a rear dormer for the primary suite, and underpinned the basement for a bright family room and guest bath.

The Result

Delivered on budget and one week early. The family gained 700 sq ft of usable space and a home appraised well above the surrounding street.

"They delivered exactly what they promised, on time and on budget. Every day the site was spotless and we always knew what was happening next."

Sarah & Daniel M. · Leslieville
Kitchen Renovation · High Park

A cramped galley becomes the heart of the home

Before — original kitchen
After — renovated kitchen
After
Before
‹ ›
Scope
Kitchen + dining
Size
420 sq ft
Budget
$96,000
Timeline
8 weeks
The Goal

A closed-off galley kitchen left the owners cooking in isolation. They wanted light, an island for their kids to gather around, and a layout that connected to the dining room.

The Solution

We removed the dividing wall, added a large quartz island, and brought in custom cabinetry to the ceiling with integrated lighting and a hidden pantry.

The Result

A bright, open kitchen the whole family lives in — completed in eight weeks with zero change-order surprises.

"We finally have the kitchen we always wanted. The team was tidy, respectful, and the final price matched the quote to the dollar."

The Anderson Family · High Park
Bathroom Renovation · The Beaches

A windowless bathroom becomes a light-filled ensuite

Before — original bathroom
After — renovated ensuite
After
Before
‹ ›
Scope
Ensuite + closet
Size
110 sq ft
Budget
$54,000
Timeline
5 weeks
The Goal

A dark, dated ensuite with no natural light felt cramped and tired. The owners wanted a calm, spa-like retreat and far better storage.

The Solution

We borrowed space from an adjacent closet, added a glass walk-in shower, heated floors, and a backlit mirror, finishing in a warm, neutral palette.

The Result

A bright, serene ensuite that feels twice its size — delivered in five weeks with the budget held to the dollar.

"The communication was incredible. A dedicated project manager updated us daily and answered every question within hours."

Priya & Raj K. · The Beaches
Basement Finishing · The Junction

An unfinished basement becomes a mortgage-helping suite

Before — unfinished basement
After — finished rental suite
After
Before
‹ ›
Scope
Legal 1-bed suite
Size
850 sq ft
Budget
$112,000
Timeline
11 weeks
The Goal

The owners wanted to turn a damp, unused basement into a legal one-bedroom rental to help offset their mortgage — without compromising on quality.

The Solution

We addressed moisture at the source, added egress and proper fire separation, and built a full kitchen and bath to code with permits handled end to end.

The Result

A warm, fully legal suite that rented within a week of completion — now covering a meaningful share of the family's monthly costs.

"Our basement suite is now a legal rental that pays our mortgage. Permits, inspections, everything handled professionally."

Michael T. · The Junction

Planning a similar project?

Request a consultation and we'll walk you through a clear plan, timeline, and transparent estimate.

Request a Consultation